Quick Overview
Worried about costly surprises during your build? Start inspections early. This checklist guides you step-by-step for European builds. It shows what to inspect at each phase. It lists when to check, who should sign off, and typical budget ranges. Use it to catch defects fast. Keep timelines tight and costs predictable. You can do this.
Key Points:
- Inspect early and often to prevent costly fixes and delays.
- Gives you control of schedule, budget, and quality.
- Require documented sign-offs and a contingency for rework.
Quick Wins You Can Do Today
Simple phase-by-phase checks catch defects early, avoid costly rework, and keep schedules on track—quick actions you can do today.
Key Points:
- Total time needed: ~85 minutes
- Money saved estimate: €500–€10,000 (depends on defects)
Project Timeline
Practical, phase-by-phase checklist: what to inspect, when to inspect it, who signs off, and a quick budget guide for inspections and likely rework. Use each short sign-off to catch defects early, keep the schedule, and avoid costly surprises.
Common Mistakes (And How to Fix Them)
Common, fixable inspection errors—how to spot and correct them fast.
Key Points:
- Prevention is easier than fixing
- When to get help
Your Action Checklist
Practical, phase-by-phase checks to catch defects early and protect your budget.
Key Points:
- Time needed: 60–90 minutes per inspection
- You've got this!